Skip to content

System 03 / 05

Formwork System

Temporary mould structures supporting concrete pours for slabs, columns, walls and related works.

Attribute
Strong support
Attribute
Reusable panels
Attribute
Precise shaping
Attribute
Clean finish

Best suited to

Concrete structures needing accurate, repeatable forming.

Slab formwork deck supported by steel props
Formwork System

Technical data

Components & specifications.

Slab, wall and column formwork — cuplock with H20 or aluminium-beam decks, aluminium panel column formwork, and the full accessory range with scaffold, LVL and steel boards.

Formwork accessories

Accessory Specification
Tie rod Ø15.5 mm, up to 6 m — SWL 90 kN
Thrust / tie plate 120 × 120 mm, 0.88 kg — SWL 90 kN
Timber waling clamp For 50–75 mm walings, 0.80 kg
Universal clamp For aluminium walers, 0.58 kg
Waterstop, wing nuts, sleeving & cones Supplied with tie-rod assemblies

Couplers — BS/EN 74 A-B, forged

Coupler Weight (kg)
Double coupler 1.00
Swivel coupler 1.00
Sleeve coupler 1.25
Putlog coupler 0.65
Joint pin 0.82
Gravlock girder coupler 1.30
Prop bracing swivel coupler 1.30

Figures from the Najm Al Ofuq Scaffolding TR LLC company profile. Confirm project-specific requirements and load ratings with our team. Download the company profile (PDF).

Call WhatsApp Request Quote